보일러

Alloy Steel Tube for Boiler

    O.D: 19.05mm - 101.6mm 

     

    W.T: 2mm - 12mm 

     

    Length: Customized

In order to respond to our customer requirements and requests, SMC provides alloy tubes to old and new customers. We will continue to exert our effort on the product quality and promise your interest here. This time we are delighted to offer high pressure boiler steel tubes, seamless petroleum steel tubes and fluid tubes, etc. Please feel free to contact us. 

 

Specifications of Alloy Steel Tube:
1) O.D: 19.05mm - 101.6mm
2) W.T: 2mm - 12mm
3) Length: Customized
4) Standard & Grade:
ASTM A213 T11, T12, T22, T5, T9
ASTM A335 P11, P12, P22, P5, P9
ASTM A199 T11, T22, T5
ASTM A209 T1, T1a, T1b
EN10216-2 10CrMo5-5, 11CrMo9-10, X11CrMo5+1, TC1, TC2
JIS G3462 STBA 12, STBA13, STBA24
5)Other alloy steel grades: 
16-50Mn, 27SiMn, 40Cr, Cr5Mo, 12Cr1MoV, 12Cr1MovG, 15CrMo, 

15CrMoG, 15CrMoV, 13CrMo44, T91, 27SiMn, 25CrMo, 30CrMo, 

35CrMo, 35CrMoV, 40CrMo, 45CrMo, 20G, Cr9Mo, 10CrMo910, 15Mo3, 

A335P11, P22, P91/T91, etc.


Tube's state-of-the-art manufacturing processes and advanced inspection 

and testing procedures ensure our boiler tube stand up to the harsh environments. 

An experienced provider to the entire energy industry, SMC is a reliable source for cold drawn and hot finished boiler tubing.  

SMC has the capability and capacity to produce the size, specifications, quality and quantities you need.

Parameters of Alloy Steel Tube:

Packaging of Alloy Steel Tube

Shanghai Metal Products are packed and labeled according to the regulations and customer's requests. Great care is taken to avoid any damage which might be caused during storage or transportation. In addition, clear labels are tagged on the outside of the packages for easy identification of the product I. D. and quality information.

1) Shanghai Metal Standard

2) Customization

Applications of Alloy Steel Tube:

1) Steam Boilers

2) Power Generation

3) Fossil Fuel Plants

4) Electric Power Plants

5) Industrial Processing Plants

6) Cogeneration Facilities

7) Waste Heat

Click here for price
Click
here
for
price

We will contact with you within 8 hours

* E-mail:Double check your email address, maybe you have spelling mistakes, thanks.
* Company Name:
 Country:
* Detail:
 Upload: browse